Software Increment Release Notes ================================ Increment ID: ACN06N16 Date created: 11/3/99 CSR number: XT93503 Title: Xtalk and Swerr on ANX DMS-X line Detailed Description of Increment: ---------------------------------- This increment is to be applied to the HDT APU load. This is an increment into Call Processing code. System Configuration / Shelf Type Requirements: ----------------------------------------------- This increment is applicable to Access Node HDT configurations with VM shelf types. Increments Needed: ------------------ ACN00N16, ACN01N16, ACN02N16, ACN03N16, ACN04N16, ACN05N16 Loads Affected: --------------- ACCL16DI, ACCD16DI, ACCV16DI, ATBL16DI Installation Instructions: -------------------------- Download increment from the Web. Either a) download the increment directly to the /iswd directory on the OPC. b) download the increment to tape and insert into the OPC tape drive. Start up Incremental SW Del. from the Software Admin toolset on the OPC. Deliver the increment: 1) Select Deliver an Increment. 2) Type y to verify your selection. Verify the increment: 1) From the ISD main menu, select Display Increments. 2) Select Display to Screen. 3) Verify the increment delivered have the correct Title and Description. Also verify that their status is "READY TO APPLY". NOTE: If the increment is a Linecard only increment, the status will be "LOAD DELIVERED". 4) Press any key to return to the main menu. Apply the increment: 1) From the ISD main menu, select Apply an Increment. 2) In the list, select the number next to the increment you delivered. 3) Select on e of these options: 1) Apply to ALL NEs (to set the increment fully into the system) 2) Trial on one NE (to test the increment to ensure that it causes no problems) If you select option 2, a list of NEs in the span of control appears. From the list of NEs, select the number next to the one you want to test. A confirmation screen appears. 4) Type y to verify your selection. 5) When the application is complete, press any key to scroll through the Summary screesn until you return to the main menu. 6) From the main menu, select Display Increments. 7) Select Display to Screen. 8) Verify that the status next to each NE now reads "APPLIED" (or "TRIAL APPLIED" if you chose to run a test in step 3 above). IF THE INCREMENT INVOLVES THE APU YOU MUST DO THE FOLLOWING STEP Dump the image: 1) From the ISD main menu, select Dump an APU Image. 2) Select one of the valid load types that can be dumped. 3) Select one of the valid NEs matching your previous parameters. 4) Type y to verify your selection. 5) When the image is complete, press any key to return to the main menu. Test Instructions: ------------------ After downloading all the patches mentioned, go offhook on an DMS-X POTS line right after the first ring splash, see if there is any FLLAICBW swer.