Software Increment Release Notes ================================ Increment ID: ACN13N16 Date created: Feb. 21, 2000 CSR numbers: XT00429, XT9A381 Title: Remove Dual VLCM Checks Detailed Description of Increment: ---------------------------------- This patch will allow customers with a DMS10 with two VLCMs to provison as a single site (only one RMM). Previously, this configuration would not work since the VLCM code couldn't identify which VLCM was carrying the test session and checks in the code were preventing VLCM messages from being accepted. This patch removes those checks, allowing the VLCM messages to come from the DMS10 without being rejected, regardless of the VLCM configuration. System Configuration / Shelf Type Requirements: ----------------------------------------------- This increment is applicable to all Access Node configurations and shelf types. Increments Needed: ------------------ ACN13N16 Loads Affected: --------------- ABM: ACCL16DI REL_1610 ABM: ACCD16DI REL_1610 Installation Instructions: -------------------------- Download increment from the Web: Either a) download the increment directly to the /iswd directory on the OPC. b) download the increment to tape and insert into the OPC tape drive. Start up Incremental SW Del. from the Software Admin toolset on the OPC. Deliver the increment: 1) Select Deliver an Increment. 2) Type y to verify your selection. Verify the increment: 1) From the ISD main menu, select Display Increments. 2) Select Display to Screen. 3) Verify the increment delivered have the correct Title and Description. Also verify that their status is "READY TO APPLY". NOTE: If the increment is a Linecard only increment, the status will be "LOAD DELIVERED". 4) Press any key to return to the main menu. Apply the increment: 1) From the ISD main menu, select Apply an Increment. 2) In the list, select the number next to the increment you delivered. 3) Select on e of these options: 1) Apply to ALL NEs (to set the increment fully into the system) 2) Trial on one NE (to test the increment to ensure that it causes no problems) If you select option 2, a list of NEs in the span of control appears. From the list of NEs, select the number next to the one you want to test. A confirmation screen appears. 4) Type y to verify your selection. 5) When the application is complete, press any key to scroll through the Summary screesn until you return to the main menu. 6) From the main menu, select Display Increments. 7) Select Display to Screen. 8) Verify that the status next to each NE now reads "APPLIED" (or "TRIAL APPLIED" if you chose to run a test in step 3 above). IF THE INCREMENT INVOLVES THE APU YOU MUST DO THE FOLLOWING STEP Dump the image: 1) From the ISD main menu, select Dump an APU Image. 2) Select one of the valid load types that can be dumped. 3) Select one of the valid NEs matching your previous parameters. 4) Type y to verify your selection. 5) When the image is complete, press any key to return to the main menu. Test Instructions: ------------------ Set up mettalic test access on the system: 1) Gain access to the DMS-10 interface 2) Make sure a line is provisioned on VLCM 2 3) Get into the PED overlay: 'ovly ped imed' 4) Start a test session on the provisiond line: 'test lpk neXX lce ' 5) Make sure the result is "PASSED"